Part 1 – Problem 10: If we make changes to our addition from what we submitted in Deliverable 2, what should we use for the D/C checks in Part 1-1? (1) The deliverable 2 addition plus existing structure OR (2) The addition that we’re currently working on, plus the existing structure but not including the retrofit of the existing structure

Because this was not clear in the instructions and the question and response were posted very close to the submission deadline, either of the above checks will be acceptable. However, we would prefer option (2) as a more direct comparison between the unretrofitted and retrofitted conditions.